9.1.14

Finish Along (FAL) Quarter 1

This year Katy at The Littlest Thistle is hosting the quarterly Finish Along.  Just in time to motivate me to list and work away at what I need and want to get done!

Finish Along 2014

1. An "ugly fabric" project.  My neighbour is in a wheel chair and asked me to make something to hold her catheter under her wheel chair.  I've made one before so it should a quick project.

2. Quilt this Sock Monkey quilt for the Pregnancy Care Centre Sew-along.

3.  Make myself another dress!  Found this fabric for $2.50/meter :)  I'll be using the same pattern as my last dress but making it a bit shorter to wear with leggings and with 3/4 length sleeves.

4.  Quilt this baby (finally!).  I was working on the blocks at last years quilt retreat and I really want to take the finished quilt this year.

5.  Another quilt for the PCC.  A couple friends and I sorted through a bunch of fabric and came up with a bunch of possible projects.  We'll see how much we get done.

I'll keep you updated!  Will you be linking up too?  

3 comments:

  1. Good list, Suzanne! Not too long and certainly doable within the 3 months. I hope to put up a bit of a list too in the next few days.

    ReplyDelete
  2. My list is to finish my projects that I've started and left laying around. Small projects to give away or birthday presents are allowed. Today I finished a quilt!

    ReplyDelete
  3. Great range of projects there, good luck!

    ReplyDelete